Published 2014
| Version v1
Report
Open
Physical start-up of the IBR-2M reactor. Core fuel loading
Description
The results of the work on core fuel loading and bringing the IBR-2M reactor to critical state, carried out by the JINR FLNP researchers in accordance with the Program of physical start-up of the modernized IBR-2 reactor, are presented. Core fuel loading of IBR-2M was begun on 17 December 2010 and completed on 14 February 2011.
Availability note (English)
Also available online: http://www1.jinr.ru/Preprints/2014/031(P13-2014-31).pdfFiles
45092933.pdf
Files
(1.6 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:c63bb765077de417109f666f1fd3e2df
|
1.6 MB | Preview Download |
System files
(47.9 kB)
| Name | Size | Download all |
|---|
Additional details
Additional titles
- Original title (Russian)
- Физический пуск модернизированного реактора IBR-2 (IBR-2M). Загрузка активной зоны
Identifiers
Publishing Information
- Imprint Pagination
- 21 p.
- Report number
- JINR-R--13-2014-31
INIS
- Country of Publication
- Joint Institute for Nuclear Research (JINR)
- Country of Input or Organization
- Joint Institute for Nuclear Research (JINR)
- INIS RN
- 45092933
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CRITICAL MASS; IBR-2 REACTOR; MULTIPLICATION FACTORS; REACTOR FUELING; REACTOR START-UP
- Descriptors DEC
- DIMENSIONLESS NUMBERS; EPITHERMAL REACTORS; FAST REACTORS; MASS; PULSED REACTORS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; START-UP
Optional Information
- Notes
- 2 refs., 10 figs., 3 tabs.