Published 2014 | Version v1
Report Open

Physical start-up of the IBR-2M reactor. Core fuel loading

Description

The results of the work on core fuel loading and bringing the IBR-2M reactor to critical state, carried out by the JINR FLNP researchers in accordance with the Program of physical start-up of the modernized IBR-2 reactor, are presented. Core fuel loading of IBR-2M was begun on 17 December 2010 and completed on 14 February 2011.

Availability note (English)

Also available online: http://www1.jinr.ru/Preprints/2014/031(P13-2014-31).pdf

Files

45092933.pdf

Files (1.6 MB)

Name Size Download all
md5:c63bb765077de417109f666f1fd3e2df
1.6 MB Preview Download

System files (47.9 kB)

Name Size Download all

Additional details

Additional titles

Original title (Russian)
Физический пуск модернизированного реактора IBR-2 (IBR-2M). Загрузка активной зоны

Publishing Information

Imprint Pagination
21 p.
Report number
JINR-R--13-2014-31

INIS

Country of Publication
Joint Institute for Nuclear Research (JINR)
Country of Input or Organization
Joint Institute for Nuclear Research (JINR)
INIS RN
45092933
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
CRITICAL MASS; IBR-2 REACTOR; MULTIPLICATION FACTORS; REACTOR FUELING; REACTOR START-UP
Descriptors DEC
DIMENSIONLESS NUMBERS; EPITHERMAL REACTORS; FAST REACTORS; MASS; PULSED REACTORS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; START-UP

Optional Information

Notes
2 refs., 10 figs., 3 tabs.