Published 1995 | Version v1
Report Open

Status report on the advanced photon source: Spring 1994

Description

Facility construction is presented for the conventional facilities, central laboratory/Office building, and the user residence facility. Accelerator systems are described in terms of commissioning and control system hardware. Insertion devices, front-end components, and monochromators are depicted in the experimental facilities. The operating energy and beam stability are discussed in terms of operations objectives. Collaborative access teams efforts are presented for the memoranda of understanding, CAT funding, and foreign participation in research at APS

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96007392; NTIS; US Govt. Printing Office Dep.

Files

27051334.pdf

Files (753.1 kB)

Name Size Download all
md5:3b683a8ed7b6adb216319edc2af8c6b9
753.1 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
10 p.
Report number
ANL--OTD-APS/CP-87468

Conference

Title
6. users meeting for the advanced photon source.
Dates
25-26 May 1995.
Place
Argonne, IL (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
27051334
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ADVANCED PHOTON SOURCE; CONSTRUCTION; DESIGN; LINEAR ACCELERATORS; PLANNING; STORAGE RINGS; SYNCHROTRONS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; RADIATION SOURCES; SYNCHROTRON RADIATION SOURCES

Optional Information

Contract/Grant/Project number
Contract W-31109-ENG-38
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-9505330--1.