Published 2008 | Version v1
Miscellaneous

Commissioning of beam acceleration in J-PARC RCS and MR

  • 1. Japan Atomic Energy Agency, J-PARC Center, Tokai, Ibaraki (Japan)

Description

The beam commissioning of the J-PARC RCS was started in October 2007 and acceleration of 1.07 x 1013 protons has been successfully achieved in February 2008. Also, the beam commissioning of MR began in May 2008. The RF capture of the beam and the extraction at the injection energy of 3 GeV was successfully performed. In both of the RCS and MR, magnetic alloy (MA) cavities are employed to achieve high accelerating voltages which are necessary to accelerate the high intensity proton beams. We employ full-digital LLRF control systems to realize precise and reproducible control of RF frequencies, voltages and phases. We present the status of the RF acceleration with examples of the beam signals. Also we discuss the future plans. (author)

Part of:
Proceedings of the 5th annual meeting of Particle Accelerator Society of Japan and the 33rd Linear Accelerator Meeting in Japan

Additional details

Additional titles

Original title (Japanese)
Dai 5 kai nippon kasokuki gakkai nenkai. Dai 33 kai riniakku gijutsu kenkyukai

Publishing Information

Imprint Title
Proceedings of the 5th annual meeting of Particle Accelerator Society of Japan and the 33rd Linear Accelerator Meeting in Japan
Imprint Pagination
986 p.
Journal Page Range
p. 337-339

Conference

Title
5. annual meeting of Particle Accelerator Society of Japan; 33. Linear Accelerator Meeting in Japan
Dates
6-8 Aug 2008
Place
Higashi-Hiroshima (Japan)

INIS

Optional Information

Notes
This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP/VISTA, MACINTOSH; Acrobat Reader is included; Data in PDF format, Folder Name: PDF, Paper ID: WP031.pdf Imprint:Dai 5 kai nippon kasokuki gakkai nenkai. Dai 33 kai riniakku gijutsu kenkyukai