Published September 1988 | Version v1
Journal article

Commissioning and first operating experience at Darlington Tritium Removal Facility

  • 1. Sulzer Bros. Ltd., Winterthur (Switzerland)
  • 2. Sulzer Canada Inc., Toronto, ON (Canada)
  • 3. Ontario Hydro Darlington Nuclear Generating Station, Bowmanville, Ontario (Canada)

Description

Ontario Hydro's Tritium Removal Facility (DTRF) is presently in its early operating phase. The DTRF was built in order to reduce the average dose rate per worker and tritium emissions in all of Ontario Hydro's CANDU reactors. As a byproduct tritium may be sold to civil users. This paper provides an overview of the system design, commissioning philosophy, program and results. Four areas of the plant are considered separately: 1. Main Extraction Process, 2. Tritium Immobilization System, 3. Glove Box Clean Up System, and 4. Support Systems

Additional details

Publishing Information

Journal Title
Fusion Technology
Journal Volume
14
Journal Issue
2
Series
Fusion Technol.
Journal Page Range
472-479
ISSN
0748-1896
CODEN
FUSTE

Conference

Title
3. topical meeting on tritium technology in fission, fusion and isotopic applications.
Dates
1-6 May 1988.
Place
Toronto (Canada).

Optional Information

Secondary number(s)
CONF-880505--.