Published 2015 | Version v1
Miscellaneous Restricted

Westinghouse integrated cementation facility. Smart process automation minimizing secondary waste

  • 1. Westinghous Electric Germany GmbH, Mannheim (Germany)

Description

The Westinghouse Cementation Facility described in this paper is an example for a typical standardized turnkey project in the area of waste management. The facility is able to handle NPP waste such as evaporator concentrates, spent resins and filter cartridges. The facility scope covers all equipment required for a fully integrated system including all required auxiliary equipment for hydraulic, pneumatic and electric control system. The control system is based on actual PLC technology and the process is highly automated. The equipment is designed to be remotely operated, under radiation exposure conditions. 4 cementation facilities have been built for new CPR-1000 nuclear power stations in China

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
INIS-FR--15-0457

Conference

Title
NUWCEM 2014 - 2. International Symposium on Cement-based Materials for Nuclear Waste
Dates
3-6 Jun 2014
Place
Avignon (France); Marcoule (France)

Optional Information

Notes
Available from the INIS Liaison Officer for France, see the 'INIS contacts' section of the INIS website for current contact and E-mail addresses: http://www.iaea.org/INIS/contacts/