Published 1980 | Version v1
Report Open

Back-end costs of alternative nuclear fuel cycles

Description

As part of its charter, the Alternate Fuel Cycle Evaluation Program (AFCEP) was directed to evaluate the back-end of the nuclear fuel cycle in support of the Nonproliferation Alternative Systems Assessment Program (NASAP). The principal conclusion from this study is that the costs for recycling a broad range of reactor fuels will not have a large impact on total fuel cycle costs. For the once-through fuel cycle, the costs of fresh fuel fabrication, irradiated fuel storage, and associated transportation is about 1.2 to 1.3 mills/kWh. For the recycle of uranium and plutonium into thermal reactors, the back-cycle costs (i.e., the costs of irradiated fuel storage, transportation, reprocessing, refabrication, and waste disposal) will be from 3 to 3.5 mills/kWh. The costs for the recycle of uranium and plutonium into fast breeder reactors will be from 4.5 to 5 mills/kWh. Using a radioactive spikant or a denatured 233U-Th cycle will increase power costs for both recycle cases by about 1 mill/kWh. None of these costs substantially influence the total cost of nuclear power, which is in the range of 4 cents/kWh. The fuel cycle costs used in this study do not include costs incurred prior to fuel fabrication; that is, the cost of the uranium or thorium, the costs for enrichment, or credit for fissile materials in the discharged fuel, which is not recycled with the system

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

12578402.pdf

Files (105.0 kB)

Name Size Download all
md5:c2b195e1ed97966b30db869d77a3061b
105.0 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
CONF-800943--6

Conference

Title
National topical meeting of fuel cycles for the 80's.
Dates
29 Sep - 2 Oct 1980.
Place
Gatlinburg, TN, USA.