Published June 7, 2012 | Version v1
Report

An Update on the DOE Early Career Project on Photonic Band Gap Accelerator Structures

Description

We performed fabrication of two SRF PBG resonators at 2.1 GHz and demonstrated their proof-of-principle operation at high gradients. Measured characteristics of the resonators were in good agreement with theoretical predictions. We demonstrated that SRF PBG cavities can be operated at 15 MV/m accelerating gradients. We completed the design and started fabrication of the 16-cell PBG accelerating structure at 11.7 GHz for wakefield testing at AWA.

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
LA-UR--12-22007

Conference

Title
15. Advanced Accelerator Concepts Workshop
Acronym
AAC2012
Dates
11-15 Jun 2012
Place
Austin, TX (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
43119351
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
DESIGN; FABRICATION; OPERATION; SUPERCONDUCTING CAVITY RESONATORS; TESTING; WAKEFIELD ACCELERATORS
Descriptors DEC
ACCELERATORS; CAVITY RESONATORS; ELECTRONIC EQUIPMENT; EQUIPMENT; LINEAR ACCELERATORS; RESONATORS; SUPERCONDUCTING DEVICES

Optional Information

Contract/Grant/Project number
AC52-06NA25396
Funding organization
DOE/LANL (United States)