BWR refill-reflood program CCFL/Refill System Effects Tests (300 Sector) Experimental Task Plan. Interim report

Description

Volume 2 of the CCFL/Refill System Effects Tests (300 Sector) Experimental Task Plan presents a definition of the approach and strategy to be followed in shakedown of the 300 sector facility. Specified in the document are equipment performance tests, an initial set of facility countercurrent flow-limiting (CCFL) tests, and predictions of selected facility phenomena. Volumes 3 and 4 define test operating techniques and specific test conditions to be utilized in the separate-effects test series and the transient loss-of-coolant simulation tests, respectively

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A05/MF A01 as DE82902209.

Additional details

Publishing Information

Imprint Pagination
80 p.
Report number
EPRI-NP--1525-Vols.2-4