Published February 1986 | Version v1
Report Open

Evolution of the on-site electric power sources on French 900 MWe PWRs

Creators

  • 1. Commissariat a l'Energie Atomique, Centre d'Etudes Nucleaires de Fontenay-aux-Roses, Departement d'Analyse de Surete, Service d'Analyse Fonctionnelle, Institut de Protection et Surete Nucleaire, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

Description

Additional means have been provided on the French 900 MWe PWRs to improve safety if both the off-site and on-site Power sources are lost, namely: - a primary pump seal water injection device, one for two units; - a gas turbine generator for each site; - supplying any failing unit with electric power from a house load operating unit; - supplying a unit from a diesel generator of another unit. (author)

Files

47078400.pdf

Files (496.0 kB)

Name Size Download all
md5:faeedfbb2d6fedeae339c9ce1d08bccf
496.0 kB Preview Download
Part of:
Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting

Additional details

Publishing Information

Imprint Title
Operating experience relating to on-site electric power sources. Proceedings of a Specialist Meeting
Imprint Pagination
399 p.
Journal Page Range
p. 350-361
Report number
NEA-CSNI-R--1986-115

Conference

Title
CSNI specialist meeting on operating experience relating to on-site electric power sources
Dates
16-18 Oct 1985
Place
London (United Kingdom)

Optional Information