Published October 31, 1978 | Version v1
Report Restricted

Recalculation of loads on LOFT penetrations 1A, 2A, 3E, 3F, 5A, 5B, 5C, 5D, 5E, 5F, 7A, 9A, 11C, 17A, 17B, 20A, 20B, 20C, 21A

Description

The loads on the piping nozzles penetrating the LOFT containment vessel are presented. Since the design and construction of the containment vessel, piping systems that penetrate the nozzles have been changed. Consequently, the moments and forces on the containment vessel are different than those stated in LOFT specification S-1. Two combined load cases were tabulated, deadweight plus thermal expansion plus operating basis earthquake and deadweight plus safe shutdown earthquake

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A06/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
119 p.
Report number
LTR--1217-7