Published July 1991 | Version v1
Report Open

HTA-project development work for high temperature reactor plants. KFA - JAERI 1991 Annual Coordination Meeting

Description

After completion of the HTTR licensing procedure in November 1990, JAERI is dedicated to building and construction of the 30 MWth, HTTR together with its industrial partners (Fuji Electric, Mitsubishi, Hitachi). Building is well under progress. Overall costs have been estimated to be about one billion DM. Criticality will be reached end of 1995 and normal operation at 850 °C is planned for 1996 -1999. Subsequently a process heat plant - to be defined - will be connected with HTTR operations at 950 °C. R+D programs will be reduced, because the licensing procedure is completed and building costs are 20 % higher than estimated. To supply the first core in the period 1996 - 2000, Nuclear Fuel Industries is in the process of setting up fuel manufacturing plant to be operated by mid-1992.

Files

52011638.pdf

Files (3.2 MB)

Name Size Download all
md5:70e30ac57634e5a188f0872c2ac27a81
3.2 MB Preview Download

System files (75.5 kB)

Name Size Download all

Additional details

Additional titles

Original title (English)
Projekt-HTA Entwicklungsarbeiten für Hochtemperaturreaktor-Anlagen. KFA - JAERI 1991 Annual Coordination Meeting

Publishing Information

Imprint Pagination
110 p.
Report number
KFA-HTA-IB--2/91

Conference

Title
KFA-JAERI Koordinationstreffen
Dates
1-2 Jul 1991
Place
Oarai, Ibarakiken (Japan)

Optional Information

Notes
Refs., figs., tabs.; Document from Juelich Preservation Project