Published 1978 | Version v1
Report Open

JINR synchrophasotron operation and improvement (the second quarter of 1978)

Description

The operation of the Dubna synchrophasotron in the 2nd quarter of 1978 when accelerating deuterons, C, O and Ne nuclei is presented. The KRION electron-beam source with improved characteristics has been used as a source of nuclei. This permits a marked increase of the nuclei intensity to be obtained at its output. The carbon, oxygen and neon nuclei are accelerated. The CKM-200 streamer chamber has been first exposed to an extracted beam of Ne nuclei with an energy of 4.1 GeV/nucleon. In order to get information on the accelerated beams of low intensity nuclei, new transmitters of two types are used. To improve the characteristics of the operating magnetic field, the work has been in progress during the synchrophasotron shutdown. A new system of geodetic measurements is used for more effective control of the position of the synchrophasotron electromagnet. Data on vertical motions of the electromagnet, obtained in two runs, are presented

Availability note (English)

MF available from INIS under the Report Number.

Files

10473734.pdf

Files (247.1 kB)

Name Size Download all
md5:6a2e76964088de544e9def6744bf9b3f
247.1 kB Preview Download

System files (25.0 kB)

Name Size Download all

Additional details

Additional titles

Original title (Russian)
Синхрофазотрон ОИЯИ. Работа и совершенствование (II квартал 1978 г.)

Publishing Information

Imprint Pagination
12 p.
Report number
JINR--9-11990

Optional Information

Notes
5 refs.; 2 figs.; 3 tables.