Experience on Primary System Decommissioning in José Cabrera NPP
- 1. Services, Decommissioning and Wastes Department, ENSA (Spain)
Description
After 38 years of energetic production, the first Spanish Nuclear Power Plant in operation, José Cabrera, a 150 megawatt pressurized water reactor (PWR), shuts down in 2006. During the next 4 years, conditioning works are carried out and finally, in 2010, the National Waste Company (ENRESA) assumes the installation ownership in order to perform José Cabrera NPP Decommissioning and Closure Plan (DCP). Primary System Decommissioning belongs to DCP works and its scope includes: Steam Generator, Pressurizer, Refrigerant Circuit Pump and Primary Circuit Piping. All these dismantling activities were carried out on site, including preliminary steps before their removal (SAS installations, pre decontaminations, cutting and segmentations, segregations, etc.) and delivery to media/low activity nuclear waste disposal site.
Additional details
Identifiers
Publishing Information
- Publisher
- IAEA
- Imprint Place
- Vienna (International Atomic Energy Agency (IAEA))
- ISBN
- 978-92-0-111416-7
- Imprint Title
- Advancing the Global Implementation of Decommissioning and Environmental Remediation Programmes. Proceedings of an International Conference. Companion CD-ROM. Book of Abstracts
- Imprint Pagination
- [1 CD-ROM]
- Series
- Proceedings Series
- Journal Page Range
- 4 p.
- ISSN
- 0074-1884
Conference
- Title
- International Conference on Advancing the Global Implementation of Decommissioning and Environmental Remediation Programmes
- Dates
- 23-27 May 2016
- Place
- Madrid (Spain)
INIS
- Country of Publication
- International Atomic Energy Agency (IAEA)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 50048498
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DECOMMISSIONING; DECONTAMINATION; NUCLEAR POWER PLANTS; PWR TYPE REACTORS; RADIOACTIVE WASTE DISPOSAL; STEAM GENERATORS
- Descriptors DEC
- BOILERS; CLEANING; ENRICHED URANIUM REACTORS; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; RADIOACTIVE WASTE MANAGEMENT; REACTORS; THERMAL POWER PLANTS; THERMAL REACTORS; VAPOR GENERATORS; WASTE DISPOSAL; WASTE MANAGEMENT; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 1 ref., 5 figs.
- Secondary number(s)
- STI/PUB--1759(Companion CD-ROM); IAEA-CN--238