Investigation on seismic characteristic in Muria Peninsula to asses the NPP seismic design

Creators

  • 1. National Atomic Energy Agency, Jakarta (Indonesia)

Description

A feasibility study on first nuclear power plant was conducted during 4,5 years started on 22 November 1991. This study consists of two parts. First, the non site study, Second part is the site and environmental study. The scope of non site studies are economic financing, technical and safety aspect as well as fuel cycle and waste management aspect. The site and environmental studied consist of site conditions and qualification, seismological, environmental condition as well as social economic and cultural impact. In the first step of site study (step 1), the result come up to the three candidates named Ujung Lemahabang, Ujung Watu and Ujung Grenggengan. Further study on geology, topography, oceanography, geophysics, hydrology, seismology, vulcanology, man induced event, etc was done on those three candidates (named as step 2). The results come up with Ujung Lemahabang as the best candidates. It is important to know basic, characteristic of seismicity of nuclear power plant sitting region for seismic hazard assessment this was done as step 3. This paper describe the results of step 3. (J.P.N.)

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Part of:
International symposium on seismic safety relating to nuclear power plants

Additional details

Publishing Information

Imprint Title
International symposium on seismic safety relating to nuclear power plants
Imprint Pagination
583 p.
Journal Page Range
p. S3/10/1-S3/10/10.
Report number
INIS-JP--074

Conference

Title
International symposium on seismic safety relating to nuclear power plants.
Dates
3-6 Mar 1997.
Place
Kobe (Japan).

Optional Information