Published March 2014
| Version v1
Journal article
Initial plan for NPP decommissioning
Description
For new nuclear power plants to be built, consideration of decommissioning shall begin early in the design stage and shall continue through to the termination of the practice or the final release of the facility from regulatory control. The regulatory body shall ensure that operators take into account eventual decommissioning activities in the design, construction and operation of the facility. The points of developing an initial decommissioning plan is design considerations to facilitate decommissioning, decommissioning project cost, and decommissioning activities. ACP1000 as an example, the paper had showed the decommissioning activities content from safety shutdown to dismantling. (authors)
Additional details
Publishing Information
- Journal Title
- China Nuclear Power
- Journal Volume
- 7
- Journal Issue
- 1
- Journal Page Range
- p. 76-80
- ISSN
- 1674-1617
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 48083417
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Descriptors DEI
- CHINA; CONSTRUCTION; CONTROL; COST; DECOMMISSIONING; DESIGN; NUCLEAR POWER PLANTS; OPERATION; PROGRAM MANAGEMENT; SAFETY; SHUTDOWN
- Descriptors DEC
- ASIA; MANAGEMENT; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- 5 refs.