Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatch

  • 1. Department of Civil and Hydraulic Engineering, Dalian University of Technology, 116024 Dalian (China)
  • 2. Department of Environmental Science and Engineering, Tsinghua University, 100084 Beijing (China)

Description

Dynamic programming (DP) is one of classic and sophisticated optimization methods that have successfully been applied to solve the problem of hydro unit load dispatch (HULD). However, DP will be faced with the curse of dimensionality with the increase of unit number and installed generating capacity of hydropower station. With the appearance of the huge hydropower station similar to the Three George with 26 generators of 700 MW, it is hard to apply the DP to large scale HULD problem. It is crucial to seek for other optimization techniques in order to improve the operation quality and efficiency. Different with the most of literature about power generation scheduling that focused on the comparisons of novel PSO algorithms with other techniques, the paper will pay emphasis on comparison study of PSO with DP based on a case hydropower station. The objective of study is to seek for an effective and feasible method for the large scale of hydropower station of the current and future in China. This paper first compares the performance of PSO and DP using a sample load curve of the Wujiangdu hydropower plant located in the upper stream of the Yangtze River in China and contained five units with the installed capacity of 1250 MW. Next, the effect of different load interval and unit number on the optimal results and efficiency of two methods has also been implemented. The comparison results show that the PSO is feasible for HULD. Furthermore, we simulated the effect of the magnitude of unit number and load capacity on the optimal results and cost time. The simulation comparisons show that PSO has a great advantage over DP in the efficiency and will be one of effective methods for HULD problem of huge hydropower stations.

Availability note (English)

Available from http://dx.doi.org/10.1016/j.enconman.2009.07.020

Additional details

Identifiers

DOI
10.1016/j.enconman.2009.07.020;
PII
S0196-8904(09)00292-1;

Publishing Information

Journal Title
Energy Conversion and Management
Journal Volume
50
Journal Issue
12
Journal Page Range
p. 3007-3014
ISSN
0196-8904
CODEN
ECMADL

Optional Information

Copyright
Copyright (c) 2009 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.