Published September 1993
| Version v1
Report
Open
Experiments in the HAW project. Progress report. ECN contribution 2. half 1992
Description
It can be stated that the installed equipment, viz. the heaters, the data collection system, the gap monitoring system and part of the special instrumentation in the A1 bore-hole, has operated well during this period. (orig./HP)
Availability note (English)
MF available from INIS under the Report Number.Files
25034762.pdf
Files
(390.9 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:3b165f0af7fd2bf04757c2c3c793ad5f
|
390.9 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 19 p.
- Report number
- ECN-C--93-056
INIS
- Country of Publication
- Netherlands
- Country of Input or Organization
- Netherlands
- INIS RN
- 25034762
- Subject category
- S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Progress Report
- Descriptors DEI
- ASSE SALT MINE; BOREHOLES; FIELD TESTS; HIGH-LEVEL RADIOACTIVE WASTES; JOULE HEATING; PROGRESS REPORT; SALT CAVERNS; SIMULATION; TEMPERATURE MEASUREMENT
- Descriptors DEC
- CAVITIES; DOCUMENT TYPES; HEATING; MATERIALS; MINES; NUCLEAR FACILITIES; RADIOACTIVE MATERIALS; RADIOACTIVE WASTE FACILITIES; RADIOACTIVE WASTES; UNDERGROUND FACILITIES; WASTES
Optional Information
- Contract/Grant/Project number
- Contract CEC F12W-0002-C(MB)