Published September 1993 | Version v1
Report Open

Experiments in the HAW project. Progress report. ECN contribution 2. half 1992

Description

It can be stated that the installed equipment, viz. the heaters, the data collection system, the gap monitoring system and part of the special instrumentation in the A1 bore-hole, has operated well during this period. (orig./HP)

Availability note (English)

MF available from INIS under the Report Number.

Files

25034762.pdf

Files (390.9 kB)

Name Size Download all
md5:3b165f0af7fd2bf04757c2c3c793ad5f
390.9 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
19 p.
Report number
ECN-C--93-056

Optional Information

Contract/Grant/Project number
Contract CEC F12W-0002-C(MB)