Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station
Creators
- 1. Ontario Power Generation, Tiverton (Canada)
- 2. Toronto Univ., Dept. of Mechanical and Industrial Engineering, ON (Canada)
Description
The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)
Availability note (English)
Available from INIS in electronic formFiles
33003404.pdf
Files
(181.9 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:6ad4ab6f69f4861dd75a369122d7a23b
|
181.9 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- [9 p.]
- Report number
- INIS-FR--456
Conference
- Title
- 9. international conference on nuclear engineering
- Dates
- 8-12 Apr 2001
- Place
- Nice, Acropolis (France)
INIS
- Country of Publication
- France
- Country of Input or Organization
- France
- INIS RN
- 33003404
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ANALYTICAL SOLUTION; CANDU TYPE REACTORS; ECONOMICS; MAINTENANCE; OPTIMIZATION; STATISTICAL MODELS; SYSTEM FAILURE ANALYSIS; TIME DELAY
- Descriptors DEC
- HEAVY WATER MODERATED REACTORS; MATHEMATICAL MODELS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; SYSTEMS ANALYSIS; THERMAL REACTORS
Optional Information
- Notes
- 5 refs.