Published April 1990 | Version v1
Miscellaneous

Analysis of the accuracy of primary coolant temperature measurement using the SVRK system

  • 1. Skoda, Plzen (Czechoslovakia). Zavod Energeticke Strojirenstvi

Description

The causes are sought of differences in the data from resistance temperature sensors and thermoelectric sensors used in measuring the coolant temperature in primary circuits. A model experiment performed in Unit 4 of the Dukovany nuclear power plant gave evidence that the thermoelectric sensors were inaccurate. The differences were due to a false data correction resulting from the neglect of the effect of temperature conditions of the connection boxes. The errors might be corrected by achieving a quasi-isothermal state of the primary circuit following temperature stabilization of the connection boxes, which would be after about 200 to 3000 hours of reactor operation. (M.D.). 3 figs

Part of:
Operation and maintenance of nuclear power plant

Additional details

Additional titles

Original title (Czech)
Analyza presnosti mereni teplot primarniho chladiva provoznim systemem SVRK

Publishing Information

Imprint Title
Operation and maintenance of nuclear power plant
Imprint Pagination
246 p.
Journal Page Range
p. 133-139.
Report number
INIS-mf--12796

Conference

Title
Operation and maintenance of nuclear power plant.
Original Conference Title
Provozovani a udrzba jaderne elektrarny
Dates
24-26 Apr 1990.
Place
Nove Mesto na Morave (Czechoslovakia).

Optional Information

Notes
Imprint:Provozovani a udrzba jaderne elektrarny.;Sbornik prednasek celostatni konference.