Design of the MiniSLAR system for Bruce A

Creators

  • 1. GE Canada Nuclear Products (Canada)

Description

Cancellation of Bruce A Retube created the need to perform SLAR on Unit 1. The existing SLAR system cannot reach Unit 1 and alternative systems had limitations. The concept and design of MiniSLAR were driven by the availability of existing components made for Retube. The MiniSLAR concept was developed by a team with members representing operators, technicians, and designers from various departments within Ontario Hydro and GE Canada. Overall project leadership was provided by Bruce A Projects and Modifications Department with assistance from Ontario Hydro Nuclear Technology Services. The responsibility for detailed design was assigned by Ontario Hydro to GE Canada. The detailed design proceeded with continual input and review by the team. The MiniSLAR delivery machine consists of a closure removal ram, a shield plug removal ram and a SLAR tool delivery ram attached to the sliding plate of a horizontal indexing mechanism. The moving plate is constrained by guide rails to a fixed plate and seals against it with o-rings. A snout and clamping mechanism mounts on the front of the fixed plate. The machine mounts atop a work table which provides the various motions required for endfitting engagement. Some operations are performed manually while others are remote and automatic. (author)

Files

29054800.pdf

Files (182.0 kB)

Name Size Download all
md5:0f30e750e0c3fe75f87da332468696c7
182.0 kB Preview Download
Part of:
Proceedings of the third international conference on CANDU maintenance

Additional details

Publishing Information

Imprint Title
Proceedings of the third international conference on CANDU maintenance
Imprint Pagination
473 p.
Journal Page Range
p. 169-174
Report number
INIS-CA--0018

Conference

Title
3. International conference on CANDU maintenance
Dates
19-21 Nov 1995
Place
Toronto, ON (Canada)

Optional Information