Published October 1996 | Version v1
Report Open

HANARO nuclear commissioning test

  • 1. HANARO Center, Korea Atomic Energy Research Institute, P.O. Box 105, Yusung, Taejon 305-600 (Korea, Republic of)

Description

Starting from the first fuel loading in HANARO on February 2, 1995, the reactor commissioning tests are almost finished successfully. All of the important nuclear characteristics of HANARO except rod-wise power distribution, are measured and the accuracy of design predictions are verified. It is confirmed that the reactor performs as designed and that the predictions by design tools have reasonable uncertainty for every nuclear characteristic. The predictions for the reactivity worth of black neutron absorber and bundle-wise power distribution by neutron diffusion code deviate from the measured ones with understandable error trends. It is believed that tuning of cross sections for the absorber positions will enhance accuracy. The measurement of rod-wise power distribution and tuning of cross sections for the diffusion code are remained for further work. (author)

Files

35089093.pdf

Files (27.0 kB)

Name Size Download all
md5:91561369002659bd057ada108b16a779
27.0 kB Preview Download
Part of:
Abstracts and papers of the 1996 International RERTR Meeting

Additional details

Publishing Information

Imprint Title
Abstracts and papers of the 1996 International RERTR Meeting
Imprint Pagination
233 p.
Journal Page Range
[1 p.]
Report number
INIS-XA-C--008

Conference

Title
19. international meeting on Reduced Enrichment for Research and Test Reactors (RERTR)
Dates
6-10 Oct 1996
Place
Seoul (Korea, Republic of)

Optional Information