Published 1998 | Version v1
Book

Advanced inspection systems for BWR- and PWR-reactor pressure vessels reducing critical path outage time

  • 1. Siemens-KWU, Freyeslebenstrasse 1, D-91058 Erlangen (Germany)

Description

In-service inspection of reactor pressure vessels is frequently a critical-path event during refueling outages. However, inspection time can be drastically shortened by using innovative inspection devices and manipulators, and by optimizing the inspection processes. These two procedures alone made it possible to reduce the time-critical reactor well dwell time to between three and four days in German nuclear power plants equipped with PWRs - roughly half the amount of time required during previous inspections. (author)

Part of:
World Nuclear Congress. Transactions Vol. III: Poster Papers

Additional details

Publishing Information

Publisher
European Nuclear Society
Imprint Place
Berne (Switzerland)
ISBN
3-9520691-3-2
Imprint Title
World Nuclear Congress. Transactions Vol. III: Poster Papers
Imprint Pagination
714 p.
Journal Page Range
p. 84-88

Conference

Title
ENC 98 World Nuclear Congress
Dates
25-28 Oct 1998
Place
Nice (France)

INIS

Country of Publication
Switzerland
Country of Input or Organization
Switzerland
INIS RN
32010741
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
IN-SERVICE INSPECTION; NONDESTRUCTIVE TESTING; NUCLEAR POWER PLANTS; OUTAGES; PRESSURE VESSELS; ULTRASONIC TESTING
Descriptors DEC
ACOUSTIC TESTING; CONTAINERS; INSPECTION; MATERIALS TESTING; NONDESTRUCTIVE TESTING; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS

Optional Information

Notes
3 figs.