Savannah River Site Seismic Qualification Program boundary selection

Description

The Savannah River Site Seismic Qualification Program utilizes methodology developed by the Seismic Qualification Utilities Group and endorsed by both the Nuclear Regulatory Commission and the Department of Energy. The systems selected for seismic upgrade prior to restart will ensure that following a seismic event, the reactor can be safely shut down, decay heat removal can be maintained, and the reactor status can be monitored for a minimum of seventy-two hours. Systems selected were reviewed to establish the boundaries of seismic qualification. Program implementation is being conducted in two phases. Phase on will be conducted prior to restart. It will include evaluating accident prevention systems and selected monitoring and mitigation systems and upgrading as necessary to ensure compliance with DOE requirements. Phase two will evaluate/upgrade other mitigation systems after restart to provide enhanced assurance of reactor safety

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92009889; NTIS; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
7 p.
Report number
WSRC-MS--91-140-Del.Ver

Conference

Title
1991 American Society of Mechanical Engineers (ASME) pressure vessels and piping conference.
Dates
23-27 Jun 1991.
Place
San Diego, CA (United States).

Optional Information

Contract/Grant/Project number
Contract AC09-89SR18035
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-910602--55-Del.Ver.