Published November 1995 | Version v1
Miscellaneous

Moscow Meson Factory Linac for the pulsed neutron source

  • 1. Inst. for Nuclear Research, Moscow (Russian Federation)

Description

Pulsed Neutron Source IN-06 based on the Moscow Meson Factory (MMF) Linac is under construction now. The first stage of Neutron Source IN-06 is planned to be put into operation in 1996. We studied the possibilities of IN-06 upgrade by means of MMF Linac modernization using existing building areas,shielding and net power consumption. (author) figs., tabs., 3 refs

Part of:
Proceedings of the meetings ICANS-XIII and ESS-PM4. Volume II

Additional details

Publishing Information

Publisher
Paul Scherrer Institut.
Imprint Place
Villigen (Switzerland)
Imprint Title
Proceedings of the meetings ICANS-XIII and ESS-PM4. Volume II
Imprint Pagination
484 p.
Series
PSI-Proceedings 95-02.
Journal Page Range
p. 724-725.
ISSN
1019-6447
Report number
INIS-mf--14817

Conference

Title
13. meeting of the International Collaboration on Advanced Neutron Sources (ICANS-XIII); 4. plenary meeting of the European Spallation Source Project (ESS).
Dates
11-14 Oct 1995; 16-19 Oct 1995.
Place
Villigen (Switzerland); Weinfelden (Switzerland).

Optional Information