The component improvement of the SPring-8 linac
Creators
- 1. Japan Synchrotron Radiation Research Institute (JASRI/SPring-8), Sayo, Hyogo (Japan)
Description
In FY2013, the total operation time of SPring-8 injector linac were 4328.3 hours. The total downtime was 0.13% (The frequency of fault was 0.22 times per day) and as stable as the last few years. We modified the timing system of linac and NS to change the beam routes every 0.5 seconds. NS timing system was changed to synchronize with that of Sy and gun trigger signals were modified to get time-shared for Sy and NS. These modifications were completed successfully in 2013 and realized no wait injection of SR and NS. A pressurized SF6 waveguide system was replaced with a vacuum waveguide system including newly developed S-band vacuum circulators and isolators in the 2013 fiscal year. (author)
Additional details
Identifiers
Publishing Information
- Imprint Title
- Proceedings of the 11th annual meeting of Particle Accelerator Society of Japan
- Imprint Pagination
- [1393 p.]
- Journal Page Range
- [4 p.]
Conference
- Title
- 11. annual meeting of Particle Accelerator Society of Japan
- Dates
- 8-12 Aug 2014
- Place
- Aomori (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 47011485
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- ACCELERATOR FACILITIES; BEAM INJECTION; BEAM TRANSPORT; ELECTRON BEAMS; LINEAR ACCELERATORS; MICROWAVE EQUIPMENT; PARTICLE BOOSTERS; RF SYSTEMS; SPRING-8 STORAGE RING
- Descriptors DEC
- ACCELERATORS; BEAMS; ELECTRONIC EQUIPMENT; EQUIPMENT; LEPTON BEAMS; PARTICLE BEAMS; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES
Optional Information
- Notes
- 5 refs., 7 figs., 1 tab.