Published 2014 | Version v1
Miscellaneous

The component improvement of the SPring-8 linac

  • 1. Japan Synchrotron Radiation Research Institute (JASRI/SPring-8), Sayo, Hyogo (Japan)

Description

In FY2013, the total operation time of SPring-8 injector linac were 4328.3 hours. The total downtime was 0.13% (The frequency of fault was 0.22 times per day) and as stable as the last few years. We modified the timing system of linac and NS to change the beam routes every 0.5 seconds. NS timing system was changed to synchronize with that of Sy and gun trigger signals were modified to get time-shared for Sy and NS. These modifications were completed successfully in 2013 and realized no wait injection of SR and NS. A pressurized SF6 waveguide system was replaced with a vacuum waveguide system including newly developed S-band vacuum circulators and isolators in the 2013 fiscal year. (author)

Part of:
Proceedings of the 11th annual meeting of Particle Accelerator Society of Japan

Additional details

Publishing Information

Imprint Title
Proceedings of the 11th annual meeting of Particle Accelerator Society of Japan
Imprint Pagination
[1393 p.]
Journal Page Range
[4 p.]

Conference

Title
11. annual meeting of Particle Accelerator Society of Japan
Dates
8-12 Aug 2014
Place
Aomori (Japan)

INIS

Country of Publication
Japan
Country of Input or Organization
Japan
INIS RN
47011485
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATOR FACILITIES; BEAM INJECTION; BEAM TRANSPORT; ELECTRON BEAMS; LINEAR ACCELERATORS; MICROWAVE EQUIPMENT; PARTICLE BOOSTERS; RF SYSTEMS; SPRING-8 STORAGE RING
Descriptors DEC
ACCELERATORS; BEAMS; ELECTRONIC EQUIPMENT; EQUIPMENT; LEPTON BEAMS; PARTICLE BEAMS; RADIATION SOURCES; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES

Optional Information

Notes
5 refs., 7 figs., 1 tab.