Published June 1993 | Version v1
Report Restricted

Application of full power blackout for C. N. Almaraz with RELAP5/MOD2

Description

The analysis group of Almaraz Nuclear Power Plant has developed a model of the plant with RELAP 5/MOD.2/36:04. This model is the result of the work-experience on the code RELAP 5/MOD.1/ that was the standard code during the period 1984--1989. Different solutions were adopted in the network to implement the RELAP 5/MOD.1/CY computer code. The first complete calculation of an accident (normal power blackout) was undertaken. All calculations presented in this report were performed on a computer CDC Cyber 180/830. The CPU time versus real time event was 22.6

Availability note (English)

MF available from INIS under the Report Number; OSTI as TI93016059; NTIS; INIS; GPO.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
98 p.
Report number
NUREG/IA--0123

Optional Information