Published June 1993
| Version v1
Report
Restricted
Application of full power blackout for C. N. Almaraz with RELAP5/MOD2
Creators
- 1. C. N. Almaraz I y II, Madrid (Spain)
Description
The analysis group of Almaraz Nuclear Power Plant has developed a model of the plant with RELAP 5/MOD.2/36:04. This model is the result of the work-experience on the code RELAP 5/MOD.1/ that was the standard code during the period 1984--1989. Different solutions were adopted in the network to implement the RELAP 5/MOD.1/CY computer code. The first complete calculation of an accident (normal power blackout) was undertaken. All calculations presented in this report were performed on a computer CDC Cyber 180/830. The CPU time versus real time event was 22.6
Availability note (English)
MF available from INIS under the Report Number; OSTI as TI93016059; NTIS; INIS; GPO.
Files
Additional details
Publishing Information
- Imprint Pagination
- 98 p.
- Report number
- NUREG/IA--0123
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 24072680
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS; S99: GENERAL AND MISCELLANEOUS;
- Resource subtype / Literary indicator
- Numerical Data
- Descriptors DEI
- ALMARAZ-1 REACTOR; ALMARAZ-2 REACTOR; COMPUTERIZED SIMULATION; OUTAGES; R CODES; REACTOR ACCIDENTS; REACTOR SAFETY; THEORETICAL DATA; TRANSIENTS
- Descriptors DEC
- ACCIDENTS; COMPUTER CODES; DATA; ENRICHED URANIUM REACTORS; INFORMATION; NUMERICAL DATA; POWER REACTORS; PWR TYPE REACTORS; REACTORS; SAFETY; SIMULATION; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Funding organization
- Nuclear Regulatory Commission, Washington, DC (United States).
- Secondary number(s)
- ICSP--AL-BOUT-R.