Published October 2011 | Version v1
Miscellaneous Open

15m cycle option for NPP PAKS operation

Creators

  • 1. Paks NPP Ltd. Paks, H-7031 (Hungary)

Description

There is an investigation started at PAKS NPP to establish a fifteen-month operation of WWER-440 Units. PAKS NPP has 4 units of WWER-440s, operating at up rated power to 500 MWe. Operation scheme is prepared to make a plan of 15m operation of four units. The plan may result that in each year would be necessary only 3 outages of 4 operating units. The fuel cycle plan of 15m cycle of 1485 MWth units is prepared. The necessary U-235 enrichment of fuel is about 4.7-4.8%. The profiling plan of pin enrichment in the assembly is proposed and the features of equilibrium cycle is determined. (Author)

Files

42105725.pdf

Files (705.1 kB)

Name Size Download all
md5:423cfbc5eb1a7aa7ed2462b0ea6d60dd
705.1 kB Preview Download
Part of:
Proceedings of the twenty-first symposium of atomic energy research on WWER physics and reactor safety

Additional details

Publishing Information

Publisher
Kiadja and KFKI Atomenergia Kutatointezet
Imprint Place
Budapest (Hungary)
ISBN
978-963-372-646-4
Imprint Title
Proceedings of the twenty-first symposium of atomic energy research on WWER physics and reactor safety
Imprint Pagination
700 p.
Journal Page Range
p. 1-13
Report number
INIS-SK--2011-029

Conference

Title
21. Atomic Energy Research Symposium on WWER Physics and Reactor Safety
Dates
19-23 Sep 2011
Place
Dresden (Germany)

Optional Information

Notes
16 figs. Imprint:Also published on CDROM 124 MBytes in PDF format