Examination of the failed feedwater sparger from Humboldt Bay 3: 1976 outage
Description
During the scheduled refueling and maintenance outage which began in July 1976 an underwater examination of vessel internals by closed circuit television discovered cracks in the leedwater sparger thermal sleeve and at the edge of the thermal sleeve to sparger weld. Apparent cracking was also detected around some of the sparger outlet holes. The sparger and thermal sleeve were later removed from the vessel and visually examined in detail. Portions of the sparger and thermal sleeve were selected and shipped to the Vallecitos Nuclear Center for a laboratory examination to determine the failure mechanism. This was the first occasion on which a comprehensive television examination of the sparger had been made. The plant has been in service since April 1963
Availability note (English)
MF available from INIS under the Report Number; General Electric Co., San Jose, CA.
Files
Additional details
Publishing Information
- Imprint Pagination
- 51 p.
- Report number
- NEDO--21488
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9363438
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CRACKS; HUMBOLDT BAY REACTOR; INSPECTION; NOZZLES; PIPE JOINTS; PRIMARY COOLANT CIRCUITS; REACTOR COMPONENTS; STAINLESS STEEL-304
- Descriptors DEC
- ALLOYS; BWR TYPE REACTORS; CARBON ADDITIONS; CHROMIUM ALLOYS; CHROMIUM STEELS; CHROMIUM-NICKEL STEELS; COOLING SYSTEMS; CORROSION RESISTANT ALLOYS; ENRICHED URANIUM REACTORS; HEAT RESISTING ALLOYS; IRON ALLOYS; IRON BASE ALLOYS; JOINTS; NICKEL ALLOYS; POWER REACTORS; REACTOR COOLING SYSTEMS; REACTORS; STAINLESS STEELS; STEELS; THERMAL REACTORS; TRANSITION ELEMENT ALLOYS; WATER COOLED REACTORS; WATER MODERATED REACTORS