Published April 1, 1989 | Version v1
Report Open

Westinghouse independent safety review of Savannah River production reactors

  • 1. Westinghouse Hanford Co., Richland, WA (USA)
  • 2. Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear and Advanced Technology Div.
  • 3. Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Services Div.
  • 4. Fauske and Associates, Inc., Burr Ridge, IL (USA)
  • 5. Westinghouse Savannah River Co., Aiken, SC (USA)

Description

Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K, L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours ampersand Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours ampersand Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone. 37 refs., 1 fig., 3 tabs

Availability note (English)

MF available from INIS under the Report Number; NTIS, PC A11/MF A01 as DE90004782; OSTI; INIS; US Govt. Printing Office Dep.

Files

21036069.pdf

Files (15.8 MB)

Name Size Download all
md5:dd319767b82aae8b9fa598f20d47acc9
15.8 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
230 p.
Report number
WSRC-RP--89-84

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930