Acceptance Test Procedure for New Pumping Instrumentation and Control Skid ''V''

Description

This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00804240; PURL: https://www.osti.gov/servlets/purl/804240-gq3xLu/webviewable/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
60 p.
Report number
RPP--6201/Rev.1

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
34022507
Subject category
S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
Descriptors DEI
DESIGN; MEASURING INSTRUMENTS; MONITORING; PERFORMANCE TESTING; PUMPING; PUMPS; RADIOACTIVE WASTES; STORAGE FACILITIES
Descriptors DEC
EQUIPMENT; MATERIALS; RADIOACTIVE MATERIALS; TESTING; WASTES

Optional Information