Published March 1976 | Version v1
Report Restricted

Plant availability - summary of report of the plant availability study group

Description

About eight years ago, the UKAEA accepted the merits of a numerical expression of safety standards, i.e., relating the safety-consequence of a fault to its chance of failure, and subsequently the safety of its plants, has been extensively analysed in this way. More recently, attention has turned to the possibilties of the improvement of availability of its plants by extensions of these analyses. A particular study in this area was commissioned about two years ago. A Study Group was formed which included engineers from the Generating Boards, from Industry, and from the UKAEA, with representatives from other organisations joining from time to time. A summary is presented of the main conclusions of the final report of the Group and recommendations for further work are outlined. (U.K.)

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
6 p.
Report number
NCSR-R--9

INIS

Country of Publication
United Kingdom
Country of Input or Organization
United Kingdom
INIS RN
7270829
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Descriptors DEI
AVAILABILITY; FAILURES; NUCLEAR POWER PLANTS; PERFORMANCE; REACTOR SAFETY; REACTOR SHUTDOWN; SYSTEMS ANALYSIS; TURBOGENERATORS
Descriptors DEC
ELECTRIC GENERATORS; NUCLEAR FACILITIES; POWER PLANTS; SAFETY; THERMAL POWER PLANTS