Important statistics on engineering and construction of nuclear power plants
Description
During the past seven years, a study was made of the engineering and craft manpower/manhour requirements, craft breakdowns by totals and peaks, material requirements, unit man-hours, rate of manhour/capital expenditures, and schedule requirements of representative nuclear power plants across the United States. The study is based on information received from electric utilities, engineer-constructors, site visits, the Nuclear Regulatory Commission (NRC), personal contacts, and the exchange of information with knowledgeable people. Preliminary data in the form of tables and figures are presented. Factors which have and will influence manpower, manhours, material requirements, building volumes, and schedules are outlined, and a list of recommendations is presented. The objective of this study has been to show in a concise fashion what the trend has been and what may be anticipated for future nuclear power plants
Additional details
Publishing Information
- Publisher
- American Nuclear Society, Inc.
- Imprint Place
- Hinsdale, IL
- Imprint Title
- Nuclear power plant construction licensing and startup
- Journal Page Range
- p. I.5.1-I.5.14.
Conference
- Title
- American Nuclear Society's topical meeting.
- Dates
- 13 Sep 1976.
- Place
- Los Angeles, California, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9358115
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- CONSTRUCTION; COST; DATA; MANAGEMENT; NUCLEAR POWER PLANTS; OCCUPATIONS; PERSONNEL; PLANNING; STATISTICS
- Descriptors DEC
- INFORMATION; MATHEMATICS; NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS
Optional Information
- Notes
- Imprint:See CONF-7609154--.