Published June 3, 2002 | Version v1
Report

Main Injector power distribution system

Description

The paper describes a new power distribution system for Fermilab's Main Injector. The system provides 13.8 kV power to Main Injector accelerator (accelerator and conventional loads) and is capable of providing power to the rest of the laboratory (backfeed system). Design criteria, and features including simulation results are given

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/795086-gJdQSz/native/

Additional details

Publishing Information

Imprint Pagination
31 Kilobytes
Report number
FERMILAB-Conf--02/094

Conference

Title
EPAC 2002
Dates
3-7 Jun 2002
Place
Paris (France)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
33024708
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM INJECTION; FERMILAB ACCELERATOR; FERMILAB TEVATRON; POWER DISTRIBUTION SYSTEMS; SIMULATION; SPECIFICATIONS
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; SYNCHROTRONS

Optional Information

Contract/Grant/Project number
AC02-76CH03000
Funding organization
USDOE Office of Energy Research (ER) (United States)