Published 1996 | Version v1
Book

Risk assessment of a hydraulic fill dam

  • 1. British Columbia Hydro, Vancouver, BC (Canada)

Description

The concerns expressed about the safety of the 85 year old 29 m hydraulic Coquitlam Dam in the Greater Vancouver area were described. Because of these concerns, and despite the fact that the dam meets the Incremental Hazard Classification criteria, B.C. Hydro carried out an evaluation with risk assessment. The processes employed and the results of the evaluation were described. It was found that although the dam was safe enough, in light of experiences with other dams, further evaluations will have to be carried out to verify these results. 2 refs., 6 figs

Additional details

Publishing Information

Publisher
Riley's Reproduction and Printing Ltd.
Imprint Place
Calgary, AB (Canada)
ISBN
0-9680811-0-X
Imprint Title
Proceedings
Imprint Pagination
356 p.
Journal Page Range
p. 17-32.

Conference

Title
Canadian dam safety conference.
Dates
Oct 1996.
Place
Niagara Falls (Canada).

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
28025498
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DAMS; ENVIRONMENTAL IMPACTS; FLOOD CONTROL; HYDROSTATICS; RISK ASSESSMENT; SAFETY

Optional Information

Secondary number(s)
CONF-9610230--.