Published 2003 | Version v1
Miscellaneous Open

Overview of electrical energy in November 2003

Description

The purpose of this document is to provide information concerning the operation of the French public transmission network and power system during the past month. The data published are interim figures dated 9 December 2003. National electrical consumption in France: national consumption is the total of all the electrical energy supplied for consumption in France (including Corsica, but not the French Overseas Departments), thermal and hydro generation + imports - exports - pumping, and which have been consumed in the transmission and distribution networks, by the end-users, as well as by losses. Gross consumption for the month of November 2003 rose by 2.5% compared with November 2002, mainly due to increased use of heating, as the average monthly temperature fell by 0.5 deg. C compared with November 2002. Adjusted for climate contingencies, monthly consumption rose by 0.9% compared with November 2002. In cumulative figures over 12 months, the rate of growth in adjusted consumption fell by 0.2% since last month, and the rate of growth in gross national consumption rose by 0.6 points. The energy balance recorded by the transmission network (the balance recorded by RTE takes into account only the energy physical flows conveyed on the RTE network). Consumption and physical exchanges, noteworthy data (these values reflect all the flows on the RTE network, as well as the generation auto-consumed by the industrial consumers connected to this network); the electricity market; the market players; contractual exchanges recorded by RTE (contracts for access to international connections, contractual exchanges by border (these exchanges include all transactions managed by RTE including historical contracts)). Transmission network development (the following facilities were commissioned on the RTE network in November): the 63 kV substation at Volvon, and the 63 kV Montrond-Volvon and Veauche-Volvon 2 lines, for strengthening 63 kV supply to the St Etienne region; the 63 kV substation at Ploufragan, connected to the 63 kV Plourhan-Tregueux line, for strengthening supply to the substations at Tregueux and St-Brieux; the 63 kV substation at Pasiphae, connected by a cable from the substation at Villeneuve St Georges, for supplying customers in the Paris region; the 63 kV Mougins-Valbonne 2 lines in the Alpes Maritimes region; previously, the substation at Valbonne had been connected to the Mougins - Lingostiere line and a section of the line was laid near Lingostiere

Availability note (English)

Available from INIS in electronic form

Files

35032699.pdf

Files (107.1 kB)

Name Size Download all
md5:539a3497d04adbd1e7ff8a56fda73338
107.1 kB Preview Download

Additional details

Additional titles

Original title (French)
Apercu sur l'energie electrique en novembre 2003

Publishing Information

Imprint Pagination
4 p.
Report number
INIS-FR--2520