Published June 7, 1990 | Version v1
Report Restricted

Seepage into PEP tunnel

Description

The current rate of seepage into the PEP tunnel in the vicinity of IR-10 is very low compared to previous years. Adequate means of handling this low flow are in place. It is not clear whether the reduction in the flow is temporary, perhaps due to three consecutive dry years, or permanent due to drainage of a perched water table. During PEP construction a large amount of effort was expended in attempts to seal the tunnel, with no immediate effect. The efforts to ''manage'' the water flow are deemed to be successful. By covering equipment to protect it from dripping water and channeling seepage into the drainage gutters, the seepage has been reduced to a tolerable nuisance. There is no sure, safe procedure for sealing a leaky shotcreted tunnel

Availability note (English)

MF available from INIS under the Report Number; NTIS, PC A02/MF A01 as DE90012656; OSTI; INIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
DOE/SF/00515--T93

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
21075804
Subject category
S43: PARTICLE ACCELERATORS;
Descriptors DEI
DRAINAGE; LEAKS; PEP STORAGE RINGS; SEALS; WATER
Descriptors DEC
HYDROGEN COMPOUNDS; OXYGEN COMPOUNDS; POLAR SOLVENTS; SOLVENTS; STORAGE RINGS

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Secondary number(s)
ABC--10.