Seepage into PEP tunnel
Description
The current rate of seepage into the PEP tunnel in the vicinity of IR-10 is very low compared to previous years. Adequate means of handling this low flow are in place. It is not clear whether the reduction in the flow is temporary, perhaps due to three consecutive dry years, or permanent due to drainage of a perched water table. During PEP construction a large amount of effort was expended in attempts to seal the tunnel, with no immediate effect. The efforts to ''manage'' the water flow are deemed to be successful. By covering equipment to protect it from dripping water and channeling seepage into the drainage gutters, the seepage has been reduced to a tolerable nuisance. There is no sure, safe procedure for sealing a leaky shotcreted tunnel
Availability note (English)
MF available from INIS under the Report Number; NTIS, PC A02/MF A01 as DE90012656; OSTI; INIS; US Govt. Printing Office Dep.
Files
Additional details
Publishing Information
- Imprint Pagination
- 3 p.
- Report number
- DOE/SF/00515--T93
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 21075804
- Subject category
- S43: PARTICLE ACCELERATORS;
- Descriptors DEI
- DRAINAGE; LEAKS; PEP STORAGE RINGS; SEALS; WATER
- Descriptors DEC
- HYDROGEN COMPOUNDS; OXYGEN COMPOUNDS; POLAR SOLVENTS; SOLVENTS; STORAGE RINGS
Optional Information
- Contract/Grant/Project number
- Contract AC03-76SF00515
- Secondary number(s)
- ABC--10.