Published February 18, 2000 | Version v1
Report

Remote handling in the Plutonium Immobilization Project: Puck handling

Description

Since the break up of the Soviet Union at the end of the Cold War, the US and Russia have been negotiating ways to reduce their nuclear stockpiles. Economics is one of the reasons behind this, but another important reason is safeguarding these materials from unstable organizations and countries. With the downsizing of the nuclear stockpiles, large quantities of plutonium are being declared excess and must be safely disposed of. The Savannah River Site (SRS) has been selected as the site where the immobilization facility will be located. Conceptual design and process development commenced in 1998. SRS will immobilize excess plutonium in a ceramic waste form and encapsulate it in vitrified high level waste in the Defense Waste Processing Facility (DWPF) canister. These canisters will then be interred in the national repository at Yucca Mountain, New Mexico. The facility is divided into three distinct operating areas: Plutonium Conversion, First Stage Immobilization, and Second Stage Immobilization. This paper will discuss the first two operations

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/752039-XYb5jd/webviewable/

Additional details

Publishing Information

Imprint Pagination
[vp.]
Report number
WSRC-TR--2000-00051

Conference

Title
ANS Summer Meeting -- Embedded Topic on DOE Spent Fuel and Fissile Material Management
Dates
4-8 Jun 2000
Place
San Diego, CA (United States)

Optional Information

Contract/Grant/Project number
AC09-96SR18500
Notes
This record replaces 31019756
Funding organization
US Department of Energy (United States)