On a quasi-isochronous B Factory in the PEP tunnel

Description

Isochronous, or quasi-isochronous storage rings with very small momentum compaction factor α for various applications are discussed. This approach looks very promising for the B-Factory design. A small momentum compaction factor reduces the bunch length at the given RF voltage. A small bunch length allows, in principle, reduction of the beta function at the interaction point (IP) with a corresponding increase of the luminosity. However, achieving this is not easy due to difficulties with local chromatic effects at the IP, more severe background problems in the detector, and enhanced adverse effects of the beam-beam interaction. Although these problems can be addressed, they require substantial changes in the present design. It is worth noting that shorter bunches would also have larger energy losses and larger energy spread, due to wake field excitation and the smaller disruption parameter reducing the enhancement factor. But energy losses scale with the bunch length σz as σz-1/2, remaining small compared with the losses due to synchrotron radiation. The disruption parameter is small in the present design anyway; hence, these effects do not cause additional problems

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92002028; NTIS; INIS; US Govt. Printing Office Dep.

Files

23011660.pdf

Files (1.3 MB)

Name Size Download all
md5:db2792745510a596ae22a59e82977547
1.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
SLAC/AP--89

Optional Information

Contract/Grant/Project number
Contract AC03-76SF00515
Funding organization
USDOE, Washington, DC (United States).