Published March 2006 | Version v1
Miscellaneous Open

opening of the first CO2 capture installation on the fumes of a coal power plant - european project Castor, Denmark

Description

The 15 March 2006, was launched the first industrial pilot of CO2 capture of the Castor project, coordinated by the IFP and financed by the european commission, on the site of the Esbjerg (Denmark) power plant. It is the first world installation allowing the CO2 capture on the fumes of a coal power plant. This document presents the pilot installation, discusses the european project Castor, the advantages of the CO2 capture and storage for a better use of the fossil energies, where and how capturing the CO2 and the Denmark energy context. (A.L.B.)

Availability note (English)

Available from INIS in electronic form

Files

38027705.pdf

Files (1.1 MB)

Name Size Download all
md5:22db1468da89b9f0e75dc9b6ac1f47fc
1.1 MB Preview Download

Additional details

Additional titles

Original title (French)
Inauguration de la premiere installation de captage du CO

Publishing Information

Imprint Pagination
17 p.
Report number
INIS-FR--5417