Published November 12, 1979 | Version v1
Report Restricted

Sustaining neutral beam power supply system for the Mirror Fusion Test Facility

Description

A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
5 p.
Report number
UCRL--82948

Conference

Title
8. symposium on engineering problems of fusion research.
Dates
13 - 16 Nov 1979.
Place
San Francisco, CA, USA.

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11542504
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ATOMIC BEAM SOURCES; MFTF DEVICES; PERFORMANCE TESTING; POWER SUPPLIES; SPECIFICATIONS
Descriptors DEC
ELECTRONIC EQUIPMENT; MAGNETIC MIRRORS; OPEN PLASMA DEVICES; TESTING; THERMONUCLEAR DEVICES

Optional Information

Secondary number(s)
CONF-791102--110.