Published November 12, 1979
| Version v1
Report
Restricted
Sustaining neutral beam power supply system for the Mirror Fusion Test Facility
Description
A fixed-price procurement contract for $24.9 million was awarded to Aydin Energy Division, Palo Alto, CA, for the design, manufacture, installation, and acceptance testing of the sustaining neutral beam power supply system (SNBPSS). This system is scheduled for completion in early 1981 and will provide the conditioned power for the 24 neutral beam source modules. Each of the 24 power supply sets will provide the accel potential of 80 kV at 88 A, the arc power, the filament power, and the suppressor power for its associated neutral beam source module
Availability note (English)
MF available from INIS under the Report Number; Available from NTIS., PC A02/MF A01.
Files
Additional details
Publishing Information
- Imprint Pagination
- 5 p.
- Report number
- UCRL--82948
Conference
- Title
- 8. symposium on engineering problems of fusion research.
- Dates
- 13 - 16 Nov 1979.
- Place
- San Francisco, CA, USA.
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 11542504
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ATOMIC BEAM SOURCES; MFTF DEVICES; PERFORMANCE TESTING; POWER SUPPLIES; SPECIFICATIONS
- Descriptors DEC
- ELECTRONIC EQUIPMENT; MAGNETIC MIRRORS; OPEN PLASMA DEVICES; TESTING; THERMONUCLEAR DEVICES
Optional Information
- Secondary number(s)
- CONF-791102--110.