Published August 1976 | Version v1
Report Restricted

Prototype vibration measurement program for reactor internals (177-fuel assembly plant). Supplement 1

Description

The surveillance specimen holder tubes installed in the Babcock and Wilcox 177-fuel assembly plants have been redesigned. The structural adequacy of this design has been verified through extensive analysis. The design adequacy will be further confirmed by measuring the vibrational response of the surveillance specimen holder tube during normal and transient flow operation. This report describes the vibration measurement program that will be conducted at Toledo Edison's Davis Besse 1 site

Availability note (English)

MF available from INIS under the Report Number.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Additional titles

Augmented title (English)
Specimen tube holders

Publishing Information

Imprint Pagination
29 p.
Report number
BAW--10038(Suppl.1)

INIS

Optional Information

Notes
Babcock and Wilcox, Lynchburg, VA.