Challenges of the ILC Main Linac
Description
With the completion of the ILC Reference Design Report (RDR), we begin the next phase of the project - development of the Engineering Design. Our strategy and priorities come from the identification, contained in the RDR, of scientific and engineering challenges of the ILC. First among these is the cost of the main linac which, including the associated earthworks and cooling/power systems, amounts to 60% of the ILC total cost. Next is the challenge to reach the highest practical gradient since this R and D has the largest cost leverage of any of the ongoing programs. Finally, we have to understand the beam dynamics and beam tuning processes in the main linac, as we will not have the opportunity to do full (or even large) scale tests of these before the linac is constructed.
Availability note (English)
Available from Video. rtsp://vmsstreamer1.fnal.gov/VMS_Site_03/Lectures/Colloquium/070725Ross/070725Ross1.rm?start=00:00:00Additional details
Publishing Information
- Imprint Pagination
- vp.
Conference
- Title
- Fermilab Colloquia, Fermi National Accelerator Laboratory (FNAL)
- Dates
- 25 Jul 2007
- Place
- Batavia, IL (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 43048481
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BEAM DYNAMICS; DESIGN; LINEAR ACCELERATORS; SAFETY REPORTS; TUNING
- Descriptors DEC
- ACCELERATORS; DYNAMICS; MECHANICS
Optional Information
- Contract/Grant/Project number
- AC02-07CH11359
- Notes
- run time 01:03:54
- Funding organization
- USDOE Office of Science (United States)