Published July 1996 | Version v1
Report Open

Guidelines for nuclear power plant safety issue prioritization information development. Supplement 5

  • 1. Pacific Northwest National Lab., Richland, WA (United States)

Description

This is the sixth in a series of reports to document the development and use of a methodology developed by the Pacific Northwest Laboratory (PNL) to calculate, for prioritization purposes, the risk, dose, and cost impacts of implementing potential resolutions to reactor safety issues (see NUREG/CR-2800, Andrews, et al., 1983). This report contains the results of issue-specific analyses for 34 generic issues. Each issue was considered within the constraints of available information at the time the issues were examined and approximately 2 staff-weeks of labor. The results are referenced as one consideration in NUREG-0933, A Prioritization of Generic Safety Issues (Emrit, et al., 1983)

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as TI96013413; NTIS; GPO.

Files

27075457.pdf

Files (7.8 MB)

Name Size Download all
md5:598c3cdbaf04a1652bb40adfd3005521
7.8 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
625 p.
Report number
NUREG/CR--2800-Suppl.5

Optional Information

Contract/Grant/Project number
Contract AC06-76RL01830
Funding organization
Nuclear Regulatory Commission, Washington, DC (United States).
Secondary number(s)
PNL--4297-Suppl.5.