Strategy for decommissioning energy producing nuclear power stations in France
Description
Although final shutdown on the first large PWR Power Stations should not occur before 2015, Electricity of France is nevertheless presently concerned by the decommissioning of its nuclear plants. The shutdown programme of the gas-graphite units is in progress and the medium power PWR plant (300 Mwe) installed at CHOOZ in the Ardennes will be finally shutdown at the end of 1991. This situation required EDF to have a policy available which enables it to simultaneously run the double operation ''Plant shutdown - decommissioning'' and ''New constructions -increasing available power'' from both the technical and financial viewpoints. (Author)
Additional details
Publishing Information
- Publisher
- Mechanical Engineering Publications Ltd.
- Imprint Place
- London (United Kingdom)
- ISBN
- 0 85298 794 3
- Imprint Title
- Nuclear Decom '92: decommissioning of radioactive facilities
- Imprint Pagination
- 254 p.
- Journal Page Range
- p. 27-32.
Conference
- Title
- decommissioning of radioactive facilities international conference.
- Acronym
- Nuclear Decom '92
- Dates
- 17-19 Feb 1992.
- Place
- London (United Kingdom).
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- United Kingdom
- INIS RN
- 24002531
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COST ESTIMATION; ECONOMICS; FRANCE; GOVERNMENT POLICIES; PWR TYPE REACTORS; REACTOR DECOMMISSIONING; REGULATIONS
- Descriptors DEC
- DECOMMISSIONING; DEVELOPED COUNTRIES; ENRICHED URANIUM REACTORS; EUROPE; LAWS; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS