Published 1990 | Version v1
Book

Predicting future performance of commerical DCS's to better match user needs at the time of operation

  • 1. Ontario Hydro, Toronto, ON (Canada)

Description

Continuous and rapid growth, development, modification and obsolescence of commercially available Distributed Control Systems (DCS's) has made it difficult for control engineers to select vendors who can meet the user's needs when the system goes into operation. It is becoming increasingly important for the control engineer to acquire an understanding of the DCS state-of-the-art and the vendor's rate of development. The control engineer can then more accurately predict the future state of each vendor's DCS to ensure the best match of vendor and user requirements. This paper introduces a simplified approach for acquiring this overall understanding and applying it to the user's project time frame. A much clearer picture then emerges of what the user can expect at the time the system is operated. The Qualified Bidders List, which satisfies user performance, functionality and project risk requirements, can then be made with greater confidence

Additional details

Publishing Information

Publisher
Instrument Society of America.
Imprint Place
Research Triangle Park, NC (USA)
ISBN
1-55617-250-8
Imprint Title
Instrumentation in the power industry
Imprint Pagination
288 p.
Journal Page Range
p. 257-264.

Conference

Title
33. power instrumentation symposium.
Dates
21-23 May 1990.
Place
Toronto (Canada).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
22085521
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
DATA PROCESSING; FOSSIL-FUEL POWER PLANTS; NUCLEAR POWER PLANTS; ON-LINE CONTROL SYSTEMS; PERFORMANCE
Descriptors DEC
CONTROL SYSTEMS; NUCLEAR FACILITIES; ON-LINE SYSTEMS; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Secondary number(s)
CONF-9005333--.