Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

Description

This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve manifolds, leak detectors, and special protective coatings similar to those previously approved for the AN Valve Pit Upgrades design package. The new transfer lines included in this package (with official line number designations) are described within

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050645; NTIS; INIS; US GOVT. PRINTING OFFICE DEP.

Files

30039920.pdf

Files (1.4 MB)

Name Size Download all
md5:78216a8ef98abb42b668ee5b54d7f5d6
1.4 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
74 p.
Report number
HNF--2375