Published 2003
| Version v1
Computer medium
Survey and alignment for BEPCII storage ring
Description
The BEPCII will be constructed for both high energy physics (HEP) and synchrotron radiation (SR) researches. It is an upgrading scheme from BEPC with two rings, e+ ring and e- ring, built in the existing BEPC tunnel. This paper will describe the required survey and alignment tolerances, the survey concept, instrumentation to position storage ring beam components, typical cell alignments. (author)
Additional details
Publishing Information
- Publisher
- Japan Synchrotron Radiation Research Institute
- Imprint Place
- Hyogo (Japan)
- Imprint Title
- IWAA2002: Proceedings of the 7th international workshop on accelerator alignment
- Imprint Pagination
- [687 p.]
- Journal Page Range
- p. 452-458
Conference
- Title
- 7. International workshop on accelerator alignment
- Acronym
- IWAA2002
- Dates
- 11-14 Nov 2002
- Place
- Mikazuki, Hyogo (Japan)
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 35093463
- Subject category
- S43: PARTICLE ACCELERATORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- ACCURACY; ALIGNMENT; BEAM BENDING MAGNETS; BEAM FOCUSING MAGNETS; CHINESE ORGANIZATIONS; COLLIDING BEAMS; COORDINATES; ERRORS; STORAGE RINGS; SYNCHROTRON RADIATION SOURCES; TUNNELS
- Descriptors DEC
- BEAMS; EQUIPMENT; MAGNETS; NATIONAL ORGANIZATIONS; RADIATION SOURCES; UNDERGROUND FACILITIES
Optional Information
- Notes
- This CD-ROM can be used for WINDOWS 9x/NT/2000/ME/XP, MACINTOSH; Acrobat Reader is included; Data in PDF format Xouya02.pdf; 4 refs., 7 figs., 1 tab.