Published December 1996 | Version v1
Report Open

A new approach to the nuclear power plant site licensing

Creators

  • 1. Israel Electric Corp. Ltd., Haifa (Israel)

Description

The Israel Electric Corporation Ltd.(IEC) conducted a survey to determine the geotechnical suitability of the Shivta Site for the purpose of erecting a Nuclear Power Station and presented the results in a Preliminary Safety Analysis Report (PSAR) to the Licensing Division of the Israel Atomic Energy Commission (LD). The studies for selecting a site in the NW Negev were conducted by multi-disciplinary teams of Israeli and US professionals, beginning in 1982, over a twelve-year period. The investigations involved comprehensive geological, geophysical, geotechnical, hydrological, as well as geomorphic and pedologic evaluations of the region and the then- proposed site locale. The prior studies were completed using highly advanced and modern tools and approaches and provided a significant amount of information related to the tectonic and seismic characteristics of the NW Negev region. (author)

Files

28024056.pdf

Files (58.2 kB)

Name Size Download all
md5:1685bda21d49e182ae16f61f8b45dcbf
58.2 kB Preview Download
Part of:
Program and book of abstracts

Additional details

Publishing Information

Imprint Title
Program and book of abstracts
Imprint Pagination
149 p.
Journal Page Range
(pt.5.1) p. 1-4.
Report number
INIS-mf--15507

Conference

Title
19. conference of the Israel Nuclear Societies.
Dates
9-10 Dec 1996.
Place
Herzliya (Israel).

INIS

Country of Publication
Israel
Country of Input or Organization
Israel
INIS RN
28024056
Subject category
S99: GENERAL AND MISCELLANEOUS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ISRAEL ATOMIC ENERGY COMMISSION; REACTOR LICENSING; REACTOR SAFETY
Descriptors DEC
ISRAELI ORGANIZATIONS; LICENSING; NATIONAL ORGANIZATIONS; SAFETY

Optional Information