Published May 1995 | Version v1
Report Open

Test report - 241-AN-274 Caustic Pump Control Building

Description

This Acceptance Test Report documents the test results of test procedure WHC-SD-WM-ATP-135 'Acceptance Test Procedure for the 241-AN- 274 Caustic Pump Control Building.' The objective of the test was to verify that the 241-AN-274 Caustic Pump Control Building functions properly based on design specifications per applicable H-2-85573 drawings and associated ECN's. The objective of the test was met

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE96050101; NTIS; US Govt. Printing Office Dep.

Files

27075085.pdf

Files (1.3 MB)

Name Size Download all
md5:3d4a0bd11d09610c756310f974cb0fb7
1.3 MB Preview Download

Additional details

Publishing Information

Imprint Pagination
76 p.
Report number
WHC-SD--WM-ATR-135

Optional Information

Contract/Grant/Project number
Contract AC06-87RL10930
Funding organization
USDOE, Washington, DC (United States).