Published June 1984 | Version v1
Report Restricted

Decontamination and decommissioning of the Westinghouse nuclear fuel facility at Cheswick, PA. Volume 1 of 2

Description

This report documents the efforts associated with the decontamination and decommissioning of the Westinghouse Nuclear Fuel Facility at Cheswick, Pennsylvania. The facility and its operations, along with non-destructive assay techniques, the management of transuranic waste, and the equipment required for dismantling and packaging these waste, are described. The report also presents detailed plans and procedures that were developed and implemented for this effort. The construction and use of a sectioning facility for large contaminated items is also discussed, and the results of the radiological survey are summarized. Finally, recommendations are given for the decontamination and decommissioning of existing facilities and for the design and construction of new facilities. Volume I contains: site/facility description; project summary; project scheduling and organization; final site condition; conclusions and recommendations; references; Appendix A - contaminated equipment contained in PFDL facility; and Appendix B - PFDL operating procedures, PFDL administrative procedures, PFDL analytical laboratory procedures, and Cheswick site industrial hygiene procedures. 7 references, 101 figures, 25 tables

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC E09/MF A01; 1 as DE84013383.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
249 p.
Report number
WCAP--10574-Vol.1